Blomberg 1409903000 C7S Power Card Assembly

Special Price $83.61 Regular Price $95.95
In stock
Available Quantity:   30
SKU
1409903000

Product Description

The Blomberg 1409903000 C7S Power Card Assembly is used to control and supply power. Works by controlling the voltage and protecting the internal circuits against fluctuating voltages that may be dangerous. The integration of tracks of circuits at a time improves circuit density to increase energy efficiency and durability. This assembly makes the operations to be constant minimizing the time. Ensures the optimal performance of the machine. This card upgrade improves the general performance and provides better operation.
0"X0"X0"
Manufacturer
https://www.hnkparts.com/media/catalog/product/1/4/1409903000-blomberg-hnkparts-1.jpg

This Part Fits the Following Models (2)

Write Your Own Review
You're reviewing:Blomberg 1409903000 C7S Power Card Assembly
Your Rating
Customer Questions
What maintenance is required for the Blomberg 1409903000 Power Card Assembly?

Ensure the appliance is unplugged before inspecting the power card assembly. Keep the surrounding area clean and dry to prevent dust or moisture damage. Regularly check wiring connections for signs of wear or looseness. Avoid electrical surges by using a stabilizer or surge protector.

What are common issues with the Blomberg 1409903000 Power Card Assembly?

  • Failure to power on or complete startup cycles.
  • Intermittent operation or random shutdowns.
  • Communication errors with control systems or sensors.
  • Overheating leading to reduced performance.
  • Burnt components or visible board damage.

Installation Steps

Step1: Unplug appliance and shut off power supply to avoid electrical shock or damage.

Step2: Remove rear panel screws to access the electronic control module area..

Step3: Carefully disconnect harness plugs without pulling on wires directly.

Step4: Remove mounting screws and lift out the old power card assembly.

Step5: Install new card, secure screws, reconnect wires, reassemble panel, then test cycle.